Assam mein har saal badhti garmi aur upar se APDCL ka bhaari electricity bill! Kya aap bhi isse pareshan hain? Rooftop solar lagwana iska sabse best aur permanent soluction hai.

2026 mein Central Govt ki PM Surya Ghar Yojana aur Assam Govt ki Double Subsidy ki wajah se solar lagwana ab pehle se kahin zyada sasta ho gaya hai. Chaliye hum aapko batate hain ki aapka kitna kharcha hoga aur kitni bachat.

 

  1. Assam Solar Cost & Subsidy Table (2026)
  2. Assam ke logon ke liye sabse achhi baat yeh hai ki yahan Double Subsidy milti hai—ek Central Govt se aur dusri Assam Govt ka alag se Top-up. Sab kaat-peet ke aapki jeb se kitna lagega, is table mein dekhiye:

 

3.      System Size 4.      Market Price (Avg) 5.      Total Combined Subsidy 6.      Net Out-of-Pocket Cost 7.      Kis Ghar Ke Liye Best Hai?
8.      1 kW 9.      ₹70,000 – ₹80,000 10.   ₹48,000 11.   ₹22,000 – ₹32,000 12.   Chote ghar (Fans, Lights, TV)
13.   2 kW 14.   ₹1,35,000 – ₹1,50,000 15.   ₹96,000 16.   ₹39,000 – ₹54,000 17.   Medium ghar (1 AC, Refrigerator)
18.   3 kW 19.   ₹1,90,000 – ₹2,15,000 20.   ₹1,30,800 21.   ₹59,200 – ₹84,200 22.   Bada parivar (2 ACs, Geyser)

 

Ek Zaroori Baat: Agar aap 3 kW se bada system (jaise 5 kW ya 10 kW) bhi lagwate hain, toh bhi aapko maximum subsidy ₹1,30,800 hi milegi.

 

  1. Ismein Kya-Kya Shamil (Include) Hota Hai?

Jab aap kisi empanelled vendor ko paise dete hain, toh us price mein yeh sab include hota hai:

Latest Solar Panels: Mono PERC ya naye TOPCon panels (jo kam dhoop mein bhi badhiya kaam karte hain).

On-Grid Inverter: Jo solar ki power ko aapke ghar ke use layak banata hai.

Heavy Structure: Galvanized Iron (GI) ke stand, jo Assam ke tez tufaan (Bordoisila) ko bhi jhel sakein.

BOS & Wiring: Safe cables, earthing kits, aur lightning arrestor (bijli girne se bachane ke liye).

APDCL Ki Approvals: Pura paper-work aur installation vendor hi karke dete hain,

  1. Kya Kuch Hidden Costs Bhi Hote Hain?

Haan, kuch khas mauko par thoda extra kharcha aa sakta hai, jiske baare mein aapko pehle se pata hona chahiye:

1.Elevated Structure (Uncha Stand): Agar aapki chhat par aas-paas ke pedon ya building ki wajah se dhoop rukti hai, toh panels ko 6-10 feet uncha uthane ke liye lohe ka extra kharcha lag sakta hai.

2.Net Metering Setup: APDCL ka naya smart bi-directional meter lagwane aur test karne ke thode se sarkari/vendor charges hote hain.

  1. Paisa Vasool Kab Hoga? (Payback & Savings)

Solar panels ki life 25 saal hoti hai. Iska mathematical hisaab bohot saaf hai:

Generations: Ek 3 kW ka system mahine mein lagbhag 360 units electricity bana deta hai.

Bachat: Isse aap har saal ₹30,000 tak ki bachat kar sakte hain.

Payback: Jo paisa aapne lagaya (man lijiye ₹70,000), woh 2 se 3 saal ke andar hi electricity bill bachakar poora vasool ho jayega. Uske baad agle 22 saal tak aapke liye bijli bilkul muft hai!

Saaf Aur Seedhe Jawaab (FAQs)

Q: Kya Assam ke monsoon aur baarishein mein solar kaam karega?

A: Bilkul karega! Solar panels ko chalne ke liye garmi nahi, balki roshni (daylight) chahiye hoti hai. Baarish ke dino mein banna thoda kam zaroor hota hai, lekin saal bhar ka average dekhein toh aap fayde mein hi rahenge.

Q: Kya Assam State Govt ki subsidy ke liye alag se bhatakna padega?

A: Nahi. Jab aap National Portal par register karenge aur APDCL select karenge, toh Central aur State dono ki subsidy ek sath hi process ho jayegi.

Q: Subsidy ka paisa kab aur kaise aata hai?

A: Pehle aapko vendor ko poore paise dene hote hain. Solar lagne aur APDCL ka net-meter chalu hone ke 15 se 30 days ke andar subsidy ka paisa direct aapke bank account mein aa jata hai.

Apne Ghar Ka Bill Zero Karna Chahte Hain?

Ab solar lagwana koi dikhava nahi, balki har mahine paise bachane ki samajhdari hai. Agar aap bhi Assam mein apne ghar par solar lagwana chahte hain toh der mat kijiye:

📞 [Free Site Assessment Book Karen] — Pata lagayein aapki chhat par kitne panel lag sakte hain.

📊 [Apna Budget aur Savings Check Karen] — Sahi system size select karne ke liye humse baat karen.

Leave a Reply

Your email address will not be published. Required fields are marked *